CDR Verification Framework Documentation
Docs: Component
Materials
Uncertainty
The embodied emissions of any materials consumed during operation (e.g., mineral, chemical, or biomass feedstocks) can be estimated based on a cradle-to-grave lifecycle assessment (LCA) of the material input. Emissions associated with any built infrastructure, including monitoring and maintenance equipment, should include both construction emissions and material embodied emissions. There are not yet consistent best practices around whether or how to account for the embodied emissions of equipment or infrastructure that is used but not owned by the project. Transparency around boundary assumptions, data sources, and uncertainties is critical for LCA consistency and comparability.
Applicable pathways
Pathway
VCL
Alkaline Waste Mineralization
3-5
Revision history

Apr 01 2024
Edited for cross-pathway consistency during a round updates and pathway additions. Removed the assertion that upfront emissions should be amortized over the expected lifetime of the project in response to ongoing debates around the correct approach to emissions amortization for CDR. Clarified that materials used for monitoring activities should be included.

Apr 10 2023
Edited for cross-pathway consistency in response to new pathway additions.

Sep 19 2022
First release.
Materials
Uncertainty
The embodied emissions of any materials consumed during operation (e.g., mineral, chemical, or biomass feedstocks) can be estimated based on a cradle-to-grave lifecycle assessment (LCA) of the material input. Emissions associated with any built infrastructure, including monitoring and maintenance equipment, should include both construction emissions and material embodied emissions. There are not yet consistent best practices around whether or how to account for the embodied emissions of equipment or infrastructure that is used but not owned by the project. Transparency around boundary assumptions, data sources, and uncertainties is critical for LCA consistency and comparability.
Revision history

Apr 01 2024
Edited for cross-pathway consistency during a round updates and pathway additions. Removed the assertion that upfront emissions should be amortized over the expected lifetime of the project in response to ongoing debates around the correct approach to emissions amortization for CDR. Clarified that materials used for monitoring activities should be included.

Apr 10 2023
Edited for cross-pathway consistency in response to new pathway additions.

Sep 19 2022
First release.